Applications for the approval of Reserved Matters pursuant to an Outline Planning Consent
You must submit the information set out below (on both the national and local validation lists) with your application for it to be accepted as a valid application and for the processing of your application to start.
We strongly encourage you to submit all applications online via the Planning Portal. However, if you choose to submit your application via the post, 2 hard copies are required of all application documents.
If you have not included any of the information that is required with your application, you should provide written justification why you consider that the information is not required. The Council will make your application invalid if it does not agree with the justification.
Download validation list for applications for the approval of Reserved Matters pursuant to an Outline Planning Consent or check list below:
National Validation Requirements
Requirement | When required |
---|---|
A completed application form | All applications |
The appropriate fee | All applications |
A location Plan | All applications |
Design and Access Statement |
When required – any application for:
But it is not required for:
|
Ownership Certificate and Agricultural Land Declaration | All applications |
Plans, drawings or information necessary to describe the development | All applications |
Local Validation Requirements
Requirement | When required |
---|---|
Community Infrastructure Levy (CIL) additional information form | For all applications including:
|
Daylight / sunlight assessment | Where the scale of buildings proposed has the potential to affect light to sensitive neighbouring uses or the design of development has the potential to restrict internal levels of natural light for proposed residential units. |
Digital Model of Proposal |
For all Major developments. |
Drainage Strategy | A Drainage Strategy is required for all Major developments not categorised as ‘Change of Use’. All Minor developments and developments categorised as ‘Change of Use’ which modify existing surface water drainage will also require a Drainage Strategy. |
Ecological assessment / protected species survey | Where development has the potential to affect designated environmentally important sites or where there is a reasonable likelihood of a protected species being present. |
Energy statement | For all major developments. |
Flood risk assessment |
A Flood Risk Assessment (FRA) should be provided with a planning application for developments in the following circumstances:
|
Foul sewage and utilities assessment | Required for all large-scale major developments. |
Heritage statement |
|
Lighting assessment | Where proposals include significant external lighting, or where external lighting has the potential to affect protected species. |
Noise and/or vibration impact assessment | Where the proposed development includes new plant or machinery and has the potential to impact upon sensitive uses or where a sensitive use is proposed in close proximity to a noise or vibration source. |
Planning statement | For all major developments and for any development that is not in accordance with the development plan. |
Plans and drawings or information necessary to describe the subject of the application (or indicative drawings in the case of an outline application where the relevant matters are reserved)
|
All applications |
Servicing and refuse management plan | This is required for all major applications and for minor applications where servicing and fire access cannot be undertaken directly from the street. |
Site plan | Where necessary to clarify the extent of the site in addition to the Location plan. |
Site survey | Where there are significant level changes within the site, and for all applications that include basements. |
Statement of community involvement | For all major developments. |
Townscape / visual impact assessment | For Major applications where structures, such as tall buildings, are proposed that have the potential to impact on protected views or the townscape. |
Tree survey / arboricultural impact assessment | Required for applications that involve the pruning or removal of existing trees and for the carrying out of demolition, building or engineering operations (including the excavation of foundations, construction of basements, any changes of level and service/utility runs) where these may affect trees both on site or on adjoining land. |
Ventilation / extraction statement | Where development includes new uses within Class A3, A4 or A5 (including changes of use) or where industrial or commercial uses require ventilation or extraction. |
Wind microclimate assessment | All applications that include tall buildings (30 m or more in height) and any other proposal where the development is likely to have an adverse effect upon the wind microclimate. |
Contents
- What you will need when submitting a planning application
- Applications for Householder Planning Permission
- Applications for Full Planning Permission or Technical Details Consent
- Applications for Outline Planning Permission
- Applications for the approval of Reserved Matters pursuant to an Outline Planning Consent
- Further information on validation requirements
- Local Validation List consultation
- Planning fees